Investment Opportunities in Iran

Project for Drilling Jack up Rig Construction in I.R of Iran

Introduction:

Considering Iranian Offshore oilfields and relevant opportunities, jack up drilling rig construction in Iran has been defined as a project.The Project is engineering, construction, testing and delivery of a Jack Up drilling rig, ready to drill, with all necessary equipment with Iranian yard and foreigner company collaborations.

Project Purpose:

1)      Drilling rig supply for Iranian offshore and cover of oil and gas industries requirements.

2)      Technology transfer to Iran and localization

3)      To use Iranian capabilities, knowledge, abilities, procurement in Design, Construction, Delivery and Acceptance.

4)      Substitute Iranian Material, equipment, consumable, machineries and fitting. Localization and Iranian capabilities putting into project is emphasized.

5)      Developing Iranian Companies capacities, abilities and knowledge in all phases (from basic design to delivery) and creating an Iranian Brand with foreigner companies collaboration.

Investment:

Based on required Jack up rig Specification, around 200,000,000 USD has been foreseen for investment. The exact amount of investment should be providing on F.S.

Service Provider Requirements:

Service provider means Foreigner Company who is providing entire services and is charge of Knowledge transfer to Iranian Yard. The below requirement should be meet by service provider;

1)      Having technical knowledge, service provider should have owned knowledge and technology. One of the well-known patent, designs is expected to transfer to Iran.

2)      Having enough recorder/traceable experiences in design, construction and delivery of offshore drilling rig.

3)      Having enough relation and reputability to fulfill the project requirement on all phases. (Basic design, detail design, production design, construction, procurement, supervision, Class Society arrangement and…)

4)      Having reputable organization and privileged background in managerial levels, technical level, experts, and financial issues and….)

Service Provider responsibilities:

1)      To transfer the knowledge and know- how to Iran and assist to creation an Iranian brand.

2)      To guarantee the performance of the jack up drilling rig.

3)      To transfer the fist-class MODU design to Iran.

4)      To procure all equipment, material, instruments, fitting and etc. from overseas and shall take effort to substitute Iranian as much as possible.

5)      To arrange presence of all equipment and machineries makers for commissioning and test in Iranian yard.

6)      To arrange for one of IACS member presence in Iranian Yard for supervision and final certificates issuing.

7)      To take effort to investigate, inspect, survey and approve Iranian manufacturer capabilities' and substitute Iranian as much as possible.

8)      To survey Iranian yard and provide upgrading plan, enable Iranian yard to construct the rig itself and take international stand.

9)      To supervise the project from commencement to delivery time and is responsible for whole project.

10)  To train all Iranian People who are in-charge of project, enable them to run the further project themselves.

Jack up rig short technical requirement:

Item

Technical Description

1

Flag State

TBA

2

Registration Port

TBA

3

Class

One of IACS member

4

Working Water Depth

375ft

5

Maximum Drilling Depth

30000ft

6

Length Hull

65.25m

7

Depth Hull

62.00m

8

Design Draft

4.50m

9

Leg Length

153.40m

10

Spud Can Area

150m2

11

Maximum Wind Speed(50 years return)

51.4 m/s(100 knots)

12

Maximum Wave Height(50 years return)

13.72 m (45 ft)

13

Maximum Wave Period(50 years return)

15.0 s 15.0 s

14

Maximum Current Speed(50 years return)

0.51 m/s (1 knot)

15

Air Gap

15.24 m (50 ft)

16

Maximum Leg Penetration

4.57 m (15 ft)

17

Variable Load in Survival Condition

2500mt

18

Variable Load in Drilling Condition

3500mt

19

Variable Load in Jacking Condition

2500mt

20

Maximum Cantilever Outreach

70ft

21

Maximum Drill Floor Outreach

20ft

22

Jacking System Type

Rack and pinion, electrical driven

23

Jacking Pinion Configuration

3x18 pinions per leg

24

Maximum Jacking Speed

0.45m/min

25

Fixation System Type

Rack and pinion, hydraulic driven

26

Fixation Pinion Configuration

18 pinions x5-tooth per leg

27

Accommodation Capability

120men of single cabin and double cabin

28

Deck Crane Quantity and Capability

3x 50mt 0ffshore deck cranes

29

Helicopter Type

S61N, Cap 437

 

 

 

 